EPC Belt Conveyor System——Sichuan Jinping Hydropower Station
[Zoom]

The system includs 2 pipe belt conveyors and 4 general belt conveyors, with total length of about 5km and max. capacity of 2500t/h. It is the first time that pipe belt conveyor is applied to transport aggregate of hydropower station in China. The project resolved the issues like horiziontal turning on conveying line and dust pollution in tunnel, and achieved good benefits in economics and society.
Data of conveyor B103:
Horizontal distance: 1595m
Lift: 102m
Pipe diameter: ?500mm
Max. capacity: 2500t/h
Belt speed: 4m/s
Belt specification: ST2500 B1900(8+6)
Drive unit: double-pulley with 3-drive units in head (Power: 3X710kw)
Take-up: hydro- take-up in head
Data of conveyor B106:
Horizontal distance: 1134m
Lift: 102m
Pipe diameter: ?500mm
Max. capacity: 2500t/h
Belt speed: 4m/s
Belt specification: ST1600 B1900(8+6)
Drive unit: double-pulley with 3-drive units at head (Power: 3X710kw)
Take-up: hydro- take-up at head